Florida wind solutions

End-to-End Wind Energy Services

From first anemometer reading to a fully operational turbine, H.R. Current manages every detail.

We plan and build wind systems for commercial, industrial, and municipal sites in Florida. You get one project lead, clear pricing, and a design made for local codes and storm conditions.

Storm-aware design 98%+ target uptime

Plan the right first step

Tell us what your site needs.

One project leadA single point of contact from study to service.
Measured decisionsAnemometry, LiDAR, and wind modelling guide the design.
Long-term careMonitoring and planned maintenance protect output.
Built around your site

Our Full Service Portfolio

Renewable energy consulting is useful only when it leads to sound engineering, practical approvals, and equipment that fits the site.

Commercial and industrial focus

Site Assessment and Wind Measurement

We place anemometers, use LiDAR where it adds value, and model the wind profile across your property. The report covers expected production, setbacks, turbulence, access, and grid conditions.

Discuss your site

Wind Project Development

Feasibility studies, financial models, incentive reviews, and interconnection planning give your team a decision-ready project. We set the assumptions out plainly.

Review project scope

Turbine Selection and Procurement

We compare major manufacturers, tower options, controls, warranties, and delivery plans. The best-fit technology must match your wind resource and operating profile.

Compare equipment options

Permitting and Regulatory Support

Our team coordinates FAA reviews, county zoning, environmental checks, utility requirements, and documentation. You see the approval path before construction begins.

Map your approval path

Installation and Commissioning

We coordinate civil work, turbine delivery, crane schedules, electrical integration, testing, and handover. Construction plans keep disruption to working facilities low.

Plan turbine installation

Operations and Maintenance

Our O&M team watches performance around the clock, schedules predictive maintenance, and responds quickly when conditions change. Service plans target 98% or better uptime.

Set up service coverage
A clear route to operating power

Our Proven Project Methodology

Each stage produces a useful decision before the next one begins.

01

Discover

Audit energy use, map wind resources, and identify the constraints that shape the site.

02

Design

Model turbine output, storage, controls, setbacks, and the connection to your facility.

03

Permit

Coordinate local, state, FAA, environmental, and utility requirements with a visible schedule.

04

Build

Manage delivery, civil work, electrical installation, testing, and commissioning around operations.

05

Operate

Monitor production, maintain equipment, and measure performance against the agreed plan.

Selected applications

Our Work in Action

Wind systems sized for real facilities and real operating schedules.

Wind turbine beside a Florida distribution warehouse at sunrise
Commercial · Davie

Warehouse energy supply

500 kWinstalled1,180 MWhannual output
Industrial wind turbine near a Florida processing facility under clear afternoon skies
Industrial · Lakeland

Processing facility support

750 kWinstalled1,640 MWhannual output
Compact wind installation on a Florida municipal services site with palms in the background
Municipal · Jacksonville

Resilient public power

300 kWinstalled720 MWhannual output
Jacksonville warehouse with a wind turbine and battery storage system during a storm-ready site inspection
Case study · Jacksonville

How a Jacksonville Warehouse Saved 31%

Demand charges were high, and storm outages made diesel backup expensive to run. H.R. Current specified a 500 kW turbine with battery storage and coordinated the interconnection work.

31%annual energy cost reduction
90%less diesel generator reliance
500kW turbine capacity

"The plan gave our operations team clear numbers before construction started. We knew where the savings came from and how the system would respond during an outage."

Obida Mezano, Facilities Director
Clear answers before commitment

Common Questions About Wind Services

A first assessment usually takes two to four weeks. Development, approvals, equipment delivery, and construction vary by site, utility, and turbine size; we provide a stage schedule after the initial review.

Yes. We prepare technical information, coordinate utility requests, track review milestones, and keep your team informed about scope changes or required upgrades.

Sometimes. Structural review, setbacks, turbulence, access, noise, and local zoning determine the answer. We assess the building and surrounding site before recommending a turbine location.

We account for Florida wind conditions in equipment selection, foundations, electrical protection, controls, inspection plans, and storm shutdown procedures. The final design follows applicable code requirements.

Have a site in mind?

Share your facility location, current energy use, and project aims. H.R. Current will help you decide whether a wind assessment is the right next move.

Talk with a wind specialist